• Products
  • Ring main unit
  • Low-voltage busduct
  • Low-voltage switchgear
  • Medium-voltage switchgear
  • High-voltage switchgear
  • Low-voltage distribution box
  • High-voltage busduct
  • Cable tray
  • Cubicle substation
  • NEWS
  • Company news
  • Industry information
  • HONOR
  • COOPERATION
  • CONTACT
  • Contact
  • Job
  • Message
  • Chinese

    Add:No. 508 Ganglong Road, Economic Development Zone, Yangzhong City, Jiangsu Province (212213 )
    Tel: 0511-88219009
    E-mail:sales@jsyineng.com

    Beijing guohua

    Publisher:Yineng group Release time :2018/7/3 9:00:21 Click on the:626 Shut down


    Project name: Beijing northeast thermoelectric center shenhua guohua gas thermoelectric project
    The construction unit: shenhua guohua (Beijing) gas thermal power co., LTD
    The construction location: Beijing chaoyang district jinzhan village area ma village land use planning in northeast thermoelectric center
    Construction scale: the new 2 * 350 mw gas steam combined cycle power generation heating units (1 set of 2 1 unit), including two grade 9 f350mw two gas turbine, waste heat boiler and 1 steam turbine generating unit;Generating capacity of 951 mw, the total heating capacity is 695 mw, the heating area of 13.9 million square meters, the project covers an area of 90000 square meters, the new construction area of 6.6 square kilometers. The total investment is 3.34888 billion yuan.


  • 0511-88219009
  • Online
  • Top